Description
              To ensure the strength and fracture resistance of tiles by performing tests (fracture strength, water absorption rate and distances).
          Responsible Entity
              
          Responsible Entity Information
          Address Erbil Construction Laboratory Directorate
Office Hours
              (8:30) a.m. to (2:00) p.m.      
          Erbil Construction Laboratory Directorate
Erbil / Ankawa Road / Opposite Abu Afif Sweets 
Email:- info@erbilcl.com
nazar@erbilcl.com
            Email:- info@erbilcl.com
nazar@erbilcl.com
0662444850(964+)
    Duhok Construction Laboratory Directorate
Duhok / Reza Neighborhood / Duhok ganjina Road 
Email :- info@duhokcl.org
            Email :- info@duhokcl.org
07504501824
    Sulaimani Construction Laboratory Directorate
Sulaimani / Industrial Zone 1 opposite Darwaza City and Aubara neighborhood 
Email:- lab_sul@yahoo.com
info@sulicl.com
            Email:- lab_sul@yahoo.com
info@sulicl.com
07705484151
    Koya Construction Laboratory Directorate
Koya / Auni Street Next to Koya Justice Office Opposite Kani Girls School 
Email:- koyaclaboratory@yahoo.com
            
    Email:- koyaclaboratory@yahoo.com
Garmian Construction Laboratory Directorate
Garmian / Kalar / Shira Naqib Square 
Email:- nabardmageed@yahoo.com
            Email:- nabardmageed@yahoo.com
07701361313   -    07719927596
    Zakho Construction Laboratory Directorate
Zakho / General Road – Ibrahim Khalil 
Email :- labzakho7@gmail.com
            Email :- labzakho7@gmail.com
07504661763
    Halabja Construction Laboratory Directorate
Halabja – Industrial Zone – Behind Halabja International Stadium 
Email :- labhalabja@yahoo.com
            Email :- labhalabja@yahoo.com
07728656940- 07501770792
    Soran Construction Laboratory Directorate
Soran Edge Castle 
Email :- soranclab@gmail.com
            Email :- soranclab@gmail.com
07512103223
    Raperin Construction Laboratory Directorate
Ranya Next to Raperin Road Repair and Protection Directorate or next to Raperin Administration 
Email:- labranya@yahoo.com
            Email:- labranya@yahoo.com
07701544865- 07501011511
    Conditions
          The party requesting the test promises to bear all the costs of the tests according to the laboratory instructions.
      
      Construction laboratories promise to perform the necessary tests on the samples submitted by the applicant.
      
      The construction laboratory shall keep the samples as long as it deems necessary, while if the requester requests the return of the samples (for materials that are not damaged and remain intact), he/she must visit the laboratory within 10 days Otherwise, the right to the results of the tests it disappears.
      
      Laboratories are obliged to take appropriate measures to preserve samples throughout their stay.
      
      In the event of damage or breakage of the samples prior to the tests, the party requesting the tests is obliged to provide “replacement samples” similar to the basic samples. If this cannot be provided, a “replacement inspection” must be carried out (if possible), subject to new costs and mutual agreement.
      
      Documents
          Bring a letter from where they are requesting an inspection (required).
          The arrival of the Supervising Engineer or his representative to bring the materials, to ensure that the materials are not changed by the Contractor.
          Quantity of materials required for inspection (features).
              Time
               The required period (5) Five to (15) fifteen working days.
          Price
              According to the letter of the Ministry of Reconstruction and Housing No. (5855) on 30/9/2015 supported by the letter of the Ministry of Finance and Economy / General Directorate of Budget / Revenues and Expenditures No. (7374) on 31/8/2015 
: 500) One hundred and thirty thousand five hundred dinars.
- Inspection of ceramic tiles (118,750) one hundred and eighteen thousand seven hundred and fifty dinars.
- Inspection of granite tiles (139,500) one hundred and thirty-nine thousand five hundred dinars.
- Inspection of marble tiles (139,500) one hundred and thirty-nine thousand five hundred dinars.
          : 500) One hundred and thirty thousand five hundred dinars.
- Inspection of ceramic tiles (118,750) one hundred and eighteen thousand seven hundred and fifty dinars.
- Inspection of granite tiles (139,500) one hundred and thirty-nine thousand five hundred dinars.
- Inspection of marble tiles (139,500) one hundred and thirty-nine thousand five hundred dinars.
Procedures
          First, the client visits the Construction Laboratory Directorate according to its geographical boundaries, in order to submit the documents and the materials to be tested.
      
      Visit the sampling room, in order to hand over the sample to the laboratory.
      
      Visit the Art Room, in order to obtain the approval of the Art Director on the requested letter to ensure the authenticity.
      
      Signature of sample collection and sending to the relevant department.
      
      Signature of Inspection and Reporting Officer to make the inspection report truthfully and accurately.
      
      Signature of the Head of the concerned department for making the inspection report truthfully and accurately.
      
      Signature of the Art Office, for verification of report to be signed by the Director.
      
      Signature of the laboratory director to approve the results.
      
      Retrieving the Inspection Report In the Reports section to retrieve the sample inspection results.
      
      Application Form
          
      Legal Documantation
          
      External Services
              پێویستە خزمەتە پەیوەندیدارەکان دەستنیشان بکرێن، ئەگەر هەبن.
          Signed by
              پێویستە ئەم خزمەتە لەلایەن بەڕێزان وەزیر/سەرۆکی دەستە و بەڕێوبەری گشتی دیوان و لیژنەی خزمەت واژوو بکرێت.
          Service ID
              MOCH-12
          Last updated
        08-11-2022